Washington University School of Medicine Mid Campus Substation Project |
National Electrical was selected to be the prime contractor for the WUSM Mid Campus Substation project.
National Electrical provided supervision and coordination of the structural, mechanical, hoisting, concrete encasement, and all aspects of construction for this project.
As depicted in the pictures, this was a large and complex undertaking, in which an existing substation was replaced with a new larger capacity substation.
The critical portions of the project involved the small area for construction of a large substation to take place, and the minimal power interruptions which could be tolerated by the school of medicine campus. Research is performed on a constant basis, and unanticipated power interruptions are not an option.
|
|